Furnace startup at Zignago Vetro Italy

There are two pieces of news about Zignago Vetro’s production at our Fossalta di Portogruaro site, which underline how the future is increasingly part of the present and has less and less to do with the past.

The first regards the switching off of furnace no. 11. It will be dismantled after years of intense activity.

The second is the consequent starting up of furnace no. 14 at the same facility: this is a natural succession, in the name of improvement.

The characteristics of the new plant
The new furnace has been conceived with the very highest levels of technology and innovation and designed with particular attention to the palletization and labelling zones. Entering in action early in July 2022, it can produce up to 370 tonnes thanks to its four lines, two of which can manage products in tandem. It specializes in F&B containers in flint glass, mainly jars but also bottles.

Why a new furnace?
Fear of change is an obstacle to innovation: for this reason, Zignago Vetro is happy to have taken this important step. The new lines have been designed to obtain maximum productivity with the least possible energy consumption, but also to occupy the spaces available in an ergonomic, logical and sustainable manner.

27.07.2022, Zignago Vetro

Il materiale informativo del sito è registrato ed appartiene all´azienda o ai terzi che lo hanno fornitoe tutti i diritti sono riservati. Qualsiasi utente che accede a tale materiale può farlo solo ad uso personale e ne è anche responsabile. Ridistribuzione o altro uso commerciale di tale materiale è espressamente proibito. Nel caso in cui il materiale sia stato ceduto da terzi, l´utente concorda di rispettare questi termini di utilizzo specificati. Glass Global non garantisce la veridicità o l´esattezza del contenuto di alcuna informazione o di siti web esterni menzionati nelle stesse.

Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.