After months of preparation, construction and inspections, Pilkington North America’s Laurinburg, North Carolina, Float 1 furnace was lit for the sixth time. Pilkington North America is part of the NSG Group.
Marking this occasion, 50-year veteran Calvin Hodges had the honour of lighting the furnace. The photo above features Mike Woodhead (Assistant Plant Manager), Calvin Hodges (Maintenance Technician) and Chris Markotich (Plant Manager).
The photo below was taken when Float 1 was lit for the first time in April of 1973. Since it was initially built in 1973, Float 1 has been through five repairs in its 50-year history.
03.11.2023, Pilkington
Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.